Bristol Field House Dome Project
Marlock Electric installed an 800 amp 480v electrical service which provides power to the dome to keep it inflated as well as power for the HVAC equipment, lighting and receptacles. Should there ever be an interuption of power the dome is protected by an 80kw automatic standby generator which will assure the dome keeps inflated.
Generac Generator
80 kw Generac generator that our crew installed to ensure this dome is kept inflated even if power is lost.
Transfer Switch & Electrical Panel
Pictured is the 800 amp 480 v electrical service that provides power to the dome, as well as the transfer switch which will allow the generator to provide power to the dome when necessary.
Pad Mounted Transformer
These transformers are important for commercial projects where the power requirements are higher.
Exterior View
Exterior view of the fully inflated dome.